Modular Skids Warehousing & Transportation

Date

March 2019

Location

Moncks Corner, SC

Industry

Data Centers

IMG 0173 V2

Component

26 Modular Skids (48,000 lbs. & 26,000 lbs.)

Equipment

130-ton rough terrain Crane, 40-60 Versa-Lift, warehouse forklifts, jack skates

Scope of Work

Warehousing

  • Supply engineering on below the hook lifting devices, lift plans and pertinent general contractor documentation for crane lifts
  • Receive 26 modular skids at ProLift warehouse
  • Offload 26 modular skids with lift crane
  • Place skids onto dollies and roll through warehouse to designated locations
  • Jack skids down onto floor and/ or temporary dunnage for storage
  • Store skids until construction schedule is ready to accept equipment

Transportation

  • Load 26 modular skids onto ProLift transport vehicle
  • Haul 26 modular skids from warehouse to construction site for offloading
20190822 082540 IMG 0174 V2 IMG 0173 V2

Customer Challenge

Our customer fell behind schedule and needed short term, flexible storage to continue construction. The pile up of equipment was costing them time and money.

Our Solution

We were able to store the equipment in one of our secure, indoor warehouses, allowing for construction to continue. When construction was complete, and the schedule called for the modular skids, we delivered all 26 pieces of equipment in seven days which put them back on schedule.